Wednesday 4 December 2019

TT06/2010/TT-BXD FREE DOWNLOAD

Determining the other costs G K The other costs are determined by the following formula: The estimate of construction performance package is determined under the instructions in Section 1, Part II, Appendix 2 of this Circular. For the constructional materials which the domestic market does not have and must import them, the price of these materials is determined on the basis of selecting the lowest price between the quotations of the manufacturer or the provider of constructional materials in line with the quality standards and origin of goods. The quotation of waste volume and costs of materials, labor, constructional machine and equipment is determined according to the instructions in Table 3. Grounds for determining the general constructional cost - The List of group of types of constructional activities, structural unit and components of works; - The works construction unit price corresponds to the group of types of constructional activities, structural unit and components of works; 2. tt06/2010/tt-bxd

Uploader: Gugul
Date Added: 13 July 2004
File Size: 58.87 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 60404
Price: Free* [*Free Regsitration Required]





Content and method of setting of construction works price 1. Determining the cost of construction investment consultation G TV 4. The detailed construction unit price of works is the economic — technical indicator, including all necessary direct cost on materials, labor and constructional machines to finish one volume unit of construction.

Phu luc TT06 BXD | An Nguyen -

Costs which have not yet been calculated or have been calculated in the cost of similar works construction or i th works items ht06/2010/tt-bxd were implemented. Where the cost of equipment of project cannot be determined as guided under Point 1.

Method of determining the cost of materials transported to the construction site G vl The price of materials transported to the construction site is determined by the following formula: The works construction estimate as stipulated in Clause 2, Article 8 of Decree No. The cost of testing of specialized construction is determined by the estimate as per instructions like the method of determining the constructional cost.

tt06/2010/tt-bxc

tt06/2010/tt-bxd

Price index of works equipment I TB is determined by the total of products of average proportion of cost of main equipment procurement, cost of installation, testing and calibration of such main equipment if any multiplied by the fluctuation coefficient of the respective costs mentioned above of the selected representative works.

For the bordering areas between provinces and centrally-run tt06/2010/tt-bbxd, the Departments of Construction need to exchange information before announcement to avoid the ttt06/2010/tt-bxd difference.

Contents of works construction estimate 1.

tt06/2010/tt-bxd

Result of determination of price index of construction Based on the grounds and principles mentioned above, the result of determination of price index of works name of works is as follows: Full year guidance lifted to The method of determining the adjusted works construction estimate is guided in Part III of Appendix 2 of this Circular.

The incomplete detailed works construction unit price and the complete detailed works construction unit price are specified in Clause 1, Article 18 of this Circular.

436c833336a7c990e618601c2ee9eea97decf52138f8ffa058ece295595e4ae6

Where the price of constructional tt06/2010/t-bxd as announced by locality is not consistent with the market price level at the place of works construction and the constructional materials not included in the announcement of price of constructional materials of the localities, the price of these constructional materials is determined on the basis of selecting the consistent price between the quotations of the manufacturer or the provider of constructional materials except for the equipment introduced for the first time and being unique on the market to ensure the satisfaction of demand for use of materials of works on progress, supply volume, quality standards and technical specification t0t6/2010/tt-bxd materials or price reference of types of constructional materials with similar standards and quality which were and are being used in other works.

The price index of construction labor of each main type worker grade is determined by the ratio between the workday unit tt06/2010/tf-bxd of constructional worker at the time compared with the original time. The construction price index announced includes the types of price index in accordance with the provisions of Points a, b and c, Clause 1 of this Article. The modified works construction estimate is determined by the following formula: Announcement of construction price index 1.

Roy Kidd consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. In case there is no sufficient conditions to determined the size, capacity or service competence according to the preliminary design plan of project or with determination but there is no data of works construction investment announced, the preliminary total construction investment is determined on the basis of data of costs of similar projects of type and grade of works, size, capacity or service competence which implemented or implementing and the other necessary costs are adjusted or added.

Cost of transport of a unit of quantity or a unit of amount tt062/010/tt-bxd equipment group of equipment from the purchasing place or ports yt06/2010/tt-bxd Vietnam transported to the construction site; - C l k: Time of announcement a For the construction price indexes announced on a monthly basis, the announcement is done in the second week of the succeeding month. The costs of project management include the cost items as stipulated under Point a, Clause 1, Article 3 of this Circular.

Estimate of package of procurement of materials and equipment installed in the works 1.

Thông tư 06/2016/TT-BXD

Price of construction labor is determined on the basis of labor unit price used in the management of cost of construction investment announced by the competent state authority at the time of calculation in line with the market labor price level. The method of making the estimate for the this cost item is like the method of determining the cost of construction as guided in Appendix 03 of this Circular. Management of price of works construction 1. The cost of construction is calculated by the volume and the complete detailed tt06/2010/tt-bx construction unit price and the complete general constructional cost is determined and aggregated as per the Table 3.

Phu luc TTBXD | Duyên võ -

Adjusting the waste of materials - For the materials forming the products as required by the design, the calculation of adjustment is based on the regulation and standard of design. The price of machine is determined by the formula: The types of lubricants, transmission oil, During the determination of cost of construction investment, the consultation contract is responsible for review tt06/2010/tt-bxx evaluation of consistency of equipment price when using the above quotations.

Determining the cost of depreciation During the use of machines, they tt06/2010/tt-bxc worn out and their value of use and value due to participation in the business and production and natural depreciation.

After studying the dossier name of verifying unit has the following opinions:

tt06/2010/tt-bxd

No comments:

Post a Comment